Edition XIII · first stepsPre-edition

Before the first drop

Edition XIII has not begun yet. But everything begins long before the first drop: going up, listening, measuring the ground, getting ready.

Follow the drop

  1. A volunteer points across the dry land

    Search.

    Going up to the land, and listening to those who know it.

  2. Two volunteers cross a dry field behind a donkey

    Observe.

    Reading the ground, the slope, what grows and what does not.

  3. A volunteer lays out the survey cables

    Measure.

    A survey of the ground below, electrode after electrode.

  4. The team walks towards the rocks

    Prepare.

    Everything that must be ready before the edition begins.

Everything begins long before the first drop.

The film

The film

1 minute, filmed by DOF's volunteers. The sound starts only when you press play.

What is planned for Edition XIII

1 to 3 January 2027 · village to be announced

  • A well, and its installation
  • Learning, play and sport with the children
  • Support for about 60 households

These are objectives. What is done will be published after the edition.